Link GLC to Project PLC Subtask
Use this subtask to establish the linkage between the General Labor Categories (GLCs) and Project Labor Categories (PLCs) for a specific project.
You must have assigned the PLC to a project on the Link Project Labor Categories to Projects screen before you can link it here. After you have linked a PLC to a GLC, the PLC displays on the timesheet during timesheet entry. This can streamline the timesheet entry process.
Use this screen whenever PLCs are required and a project work force has not been set up and linked to categories. If PLC tracking is required on a given project, the sequence of edits required to obtain the proper PLC on a timesheet is as follows:
- Costpoint checks the project work force link to PLCs.
- Costpoint checks the GLC link (this screen).
- Costpoint checks the default PLC on the Manage Employee Information screen.
- If no default is found, you must manually enter the PLC on the timesheet.
General Labor Categories
| Field | Description | 
|---|---|
| GLC | This non-editable column displays all of the GLCs from the General Labor Category table window. | 
| Description | This non-editable column displays the description of each GLC displayed. | 
| Select | After you have highlighted PLCs and GLCs to be linked in their respective tables, click this button to move them to the Selected Project/General Labor Categories table window. | 
| Deselect | Click this button to remove any selected Project/General Labor Categories from the Selected Project/General Labor Categories table window. This unlinks the highlighted PLC/GLC combination(s) for the selected project. | 
Link GLC to Project PLC
Selected Project/General Labor Categories
| Field | Description | 
|---|---|
| PLC | This column displays all of the selected PLCs that are linked with GLCs. You can link one PLC to multiple GLCs; however, you cannot link more than one PLC to a GLC. | 
| PLC Description | This column displays the description of each PLC. | 
| GLC | This column displays all of the GLCs selected for linkage to PLCs. You cannot link one GLC to more than one PLC. | 
| GLC Description | This column displays the description of each GLC. |