Contents of the Manage Projects for Export Screen
Use the fields and options to configure the Manage Projects for Export screen.
Table Window
Use this table to select and flag existing Costpoint projects as Time Collection projects, Expense projects, or Time & Expense projects, or as projects that should not be exported.
When you initialize the screen, the table window in this group box displays all projects from the Manage Project User Flow. After you highlight project rows, you can select the appropriate Export Project Value from the drop-down list and click the Assign Export Project Value button to assign the selected value to multiple projects. You can also assign export project values to each project using the Export Project column in the table.
Field | Description |
---|---|
Project |
This column displays the project ID. |
Project Name |
This column displays the project name. |
Deltek Time and Expense Export Type |
From the drop-down list, select the export project value of each project. Its contents depend on the Time Collection version selected on the Corporate Labor Settings subtask of the Configure Labor Settings screen and the licensing for Deltek Time & Expense. If you are licensed for both Deltek Time and Deltek Expense, valid options are:
You can either assign an export project value to each project using this drop-down list or you can assign export project values to multiple projects using the Deltek Time and Expense Export Type drop-down list in the Mass Update Projects section |
Export to Shop Floor Time | Select this checkbox if this project will be used in Shop Floor Time. This check box is available if you have a Shop Floor Time license. |
Allow Edit (Export to Shop Floor Time) | Select this checkbox to enable edits of the Export to Shop Floor Time option at this project's lower-level tasks. This check box is available if you have a Shop Floor Time license. |
Export to Manufacturing Execution | Select this checkbox if this project will be used in Manufacturing Execution. This check box is available if you have a Manufacturing Execution license. |
Allow Edit (Export to Manufacturing Execution) | Select this checkbox to enable edits of the Export to Manufacturing Execution option at this project's lower-level tasks. This check box is available if you have a Manufacturing Execution license. |
Mass Update Projects
Field | Description |
---|---|
Deltek Time and Expense Export Type |
From the drop-down list, select the export project type options. Its contents depend on the Time Collection version selected on the Configure Labor Settings screen and the licensing for Deltek Time & Expense. If you are licensed for both Deltek Time and Deltek Expense, the following four options display:
|
Assign |
Click this button to assign the selected export project value to the highlighted projects. |
Export to Shop Floor Time |
These options are available if you have a Shop Floor Time license.
|
Export to Manufacturing Execution |
These options are available if you have a Manufacturing Execution license.
|