Burdened Labor and ODC’s Report
The Burdened Labor and ODC's report displays the burdened costs by resource for labor, and by account for non-labor, by project; information that was previously unavailable in Costpoint.
This report uses specific tables, which need to be created by a specific process in Costpoint, relating to Deltek Cobra integration. You do not have to be licensed or use COBRA to run this report. Refer to the user guide for more details about specific setup instructions before running this report.
A project is identified as a Cobra program by checking the Cobra Program check box on the Manage Project User Flow screen in Costpoint. This option can only be selected at the top level of the project and if selected, the entire project tree will be included in the Compute Cobra Burden Costs process.
- Related Topics:
- Prompts
Use the Burdened Labor and ODC's prompts to configure the report. - Sample Report
View a sample of the Burdened Labor and ODC's report.