Contents of the Configure Bills of Material Setting Screen
Use the fields and options to configure the Configure Bills of Material Setting screen.
This screen consists of two blocks: BOM Settings and BOM Corporate Settings.
BOM Settings
Use this block to specify settings for the Bills of Material applications.
MBOM Release Control
Use this group box to specify settings for applications related to manufacturing bills of materials (MBOM).
Field | Description |
---|---|
Use Separate MBOM Release Function |
Select this checkbox to require users to access the Release Manufacturing Bills of Material screen in order to fully or partially release the MBOM of an assembly, as well as to update the status of a released MBOM.
|
Allow Prereleased components to be Released | Select this checkbox to allow components entered on an MBOM with a status of pre-release to be checked as
Released on the Manage Manufacturing Bills of Materials screen. This
setting enables the Comp Released checkbox on the MBOM line even if the line is in Pre-Release status. When the Comp Released checkbox is selected, MRP will then plan for those components and the user will then be able to firm planned orders into the requisition or manufacturing orders. The Action Messages in Manage MRP Action Messages also shows the Part status. |
Default Component Release Status in Bill
Use this group box to determine the default status for new component lines that are included in unreleased assemblies in the Manage Manufacturing Bills of Material and Release Manufacturing Bills of Material screens.
Field | Description |
---|---|
Released |
Select this option to give new components of unreleased or partially released assemblies a default status of Released, where the Component Release checkbox is selected in the Manage Manufacturing Bills of Material and/or Release Manufacturing Bills of Material screens. If the new component's status is not Released in the Manage Parts screen in Costpoint Product Definition, and this option is selected when you add the component to an MBOM, Costpoint displays an error message. |
Unreleased |
Select this option to give new components a default status of Unreleased, where the Component Released checkbox is clear in the Manage Manufacturing Bills of Material and/or Release Manufacturing Bills of Material screens. |
Part Status |
If you select the Part Status option, the component release status is set to the status of the part set up in the Manage Parts screen.
If the new component's status is not Released in the Manage Parts screen and this option is selected when you add the component to an MBOM, a warning message displays. If the assembly is released, Costpoint will automatically set the component status to Released. |
EBOM Release Control
Use this group box to specify settings for applications related to engineering bills of materials (EBOM).
Field | Description |
---|---|
Use Separate EBOM Release Function |
Selecting this checkbox requires you to access the Release Engineering Bills of Material screen in order to fully release the EBOM of an assembly, as well as to update the status of a released EBOM.
|
Default Component Release Status in Bill
Use this group box to determine the default status for new component lines that are included in unreleased assemblies in the Manage Engineering Bills of Material and Release Engineering Bills of Material screens.
Field | Description |
---|---|
Released |
Select this option to give new components of unreleased assemblies a default status of Released, where the Component Release checkboxis selected in the Manage Engineering Bills of Material and Release Engineering Bills of Material screens. If the new component's status is not Released in the Manage Parts screen, and this option is selected when you add the component to an EBOM, Costpoint displays an error message. |
Unreleased |
Select this option to give new components a default status of Unreleased, where the Component Released checkbox is clear in the Manage Engineering Bills of Material and Release Engineering Bills of Material screens. |
Part Status |
If the Part Status option is selected, the component status is set to the status of the part set up in the Manage Parts screen.
|
Document Release Control
Use this group box to specify setting for releasing BOM documents.
Field | Description |
---|---|
Use Separate Document Release Function |
If you select this checkbox, you must run the Release Documents screen before you can fully or partially release a document, or edit a released document record, in the Manage Documents screen. If you clear this checkbox, you can release a document in the Manage Documents screen by selecting Released in the Status drop-down list. |
Default Initial Document Status
Use this group box to specify whether BOM documents are released or unreleased by default.
Field | Description |
---|---|
Released |
Select this option to give the new document a default status of Released. |
Unreleased |
Select this option to give the new document a default status of Unreleased. |
Additional Settings
Use this group box to specify whether or not to associate the default company CAGE ID to BOM documents.
Field | Description |
---|---|
Default Company CAGE ID to Document |
Select this checkbox to associate the default company CAGE ID to BOM documents. |
Default BOM Line Number to Find Number |
Select this checkbox to default BOM Line Number to Find Number. |
BOM Corporate Settings
Use this block to specify corporate settings for Bills of Material applications.
Field | Description |
---|---|
Use Configuration IDs |
Select this checkbox to allow the setup and use of configuration identifiers in Costpoint Bills of Material. Use configuration identifiers to create and store different versions of the BOM of an assembly part, to represent different options. Clear this checkbox to disable the Manage Configuration Identifiers screen and hide or disable all Configuration ID fields and other related fields. |
Use Engineering Bills of Material |
Select this checkbox to enable the screens under the Engineering Bills of Material menu so that you can maintain and store EBOMs. You can also use EBOMs, where applicable, throughout Costpoint. Clear this checkbox to access MBOMs only. |
Use Extended Length Reference Designators |
Select this checkbox to enable the entry of 32,000 characters in all Reference Designator fields. Clear this checkbox to use the standard 254-character length. Warning: Changing the status of this checkbox after you have populated and saved certain
Reference Designator fields for the MBOM or EBOM assembly may cause data integrity problems. If you change this checkbox from clear to selected, you must run the Convert Reference Designators from Short to Long screen. Conversely, you must run the Convert Reference Designators from Long to Short screen whenever you change the
Use Extended Length Reference Designators checkbox from selected to clear.
|