Deductions Subtask
Use this subtask to select the deductions/contributions that you want to include in the deduction group for the selected date range in the Effective Dates subtask of the Manage Deduction Group Limits screen.
Contents
| Field | Description |
|---|---|
| Deduction Code |
Enter, or click
|
| Description |
This field displays the description for the selected deduction code that will be included in the deduction group |
| Priority |
Enter the order in which the deductions will be taken when the group limit is reached. Enter a priority number if you selected Priority option on the Manage Deduction Group Limits screen as the method for calculating the remaining deduction/contributions. The highest priority is 1. Note: Contributions are always taken last after calculating deductions.
|
| Include Deduction |
Select this check box to include the deduction amount in the group limit. |
| Include Contribution |
Select this check box to include the contribution amount in the group limit. |
to select, the deduction code to be included in the deduction group for the selected date range.